PROJECT 1794 FINAL DEVELOPMENT SUMMARY REPORT
AI-Generated Summary
This report summarizes the successful feasibility study of a circular, jet-propelled VTOL aircraft (Project 1794/704) by Avro Aircraft Limited. It confirms the design's potential for supersonic flight (Mach 3-4) and high-altitude operation, while outlining requirements for further development and testing.
This document is the Final Development Summary Report for Project 1794, covering the period from April 2, 1955, to May 31, 1956. The report, issued by Avro Aircraft Limited in Malton, Ontario, details the feasibility study and design configuration efforts for a new type of jet-propelled, circular planform aircraft capable of vertical take-off and landing (VTOL). The project, also referred to as Project 704, aimed to develop an aircraft that could operate from ground cushion take-off to supersonic flight at high altitudes. The report concludes that the proposed stabilization and control method, which uses propulsive jets to control the aircraft, is feasible. Performance estimates for the aircraft, assuming a 1200°K main combustion temperature, include a maximum level speed of Mach 3.0, a supersonic ceiling of 94,000 feet, and a still air range of approximately 1,000 nautical miles. The report details extensive wind tunnel testing conducted at the Wright Air Development Centre and the Massachusetts Institute of Technology, involving various models to study air cushion effects, stability, control, and air intake performance. The report also outlines the development and production aspects, noting that the aircraft's symmetry allows for simpler manufacturing and lower costs compared to conventional aircraft. The report includes a financial statement and a cost forecast for future development programs, estimating a total of $3,168,000 for an 18 to 24-month period. The document emphasizes that while the feasibility of the design has been established, further tests are required to fully substantiate the performance and to refine the internal air intake flow and control systems. The report includes numerous figures illustrating the aircraft's design, wind tunnel models, and performance data.
It is concluded that the stabilization and control of the aircraft in the manner proposed - the propulsive jets are used to control the aircraft - is feasible and the aircraft can be designed to have satisfactory handling through the whole flight range from ground cushion take-off to supersonic flight at very high altitude.
PDF not loading? Download the PDF directly
Official Assessment
The stabilization and control of the aircraft in the manner proposed - the propulsive jets are used to control the aircraft - is feasible and the aircraft can be designed to have satisfactory handling through the whole flight range from ground cushion take-off to supersonic flight at very high altitude.
The project successfully demonstrated the feasibility of a circular, jet-propelled VTOL aircraft. Supersonic tests indicated performance potential exceeding initial estimates, including speeds between Mach 3 and Mach 4 and a ceiling over 100,000 feet. The design utilizes a ducted fan arrangement with radial flow engines.
Key Persons
- J.C.M. FrostChief Design Engineer, Special Projects Group, Avro Aircraft Limited
- H.C. MoodyEngineering Manager, Special Projects Group, Avro Aircraft Limited